planreview-TEMP21-1310_61799dc09c601PLAN REVIEW REPORT
Dream Custom LLC TEMP21-1310
Permit #: TEMP21-1310 / Lot 1 / 10 Daly Avenue Sub. / 10 DALY AVE
Design Team
Builder: Dream Custom LLC
Contact Name: Fransisco
Address: , ,
Phone: (435) 659-4943
Email: dreamcustomllc@gmail.com
Building Plan Review
Item Date Approved Approval Final Comments
Plans 10/08/21 Approved 10/08/21 - Scott Olsen - Approved - See notes on
approved plans
Equipment Specifications 10/08/21 Not Applicable 10/08/21 - Scott Olsen - N/A
Site Plan 10/08/21 Approved 10/08/21 - Scott Olsen - Approved
HOA Subdivision Notification 10/07/21 Not Applicable 10/07/21 - Crystal
Kaufman
- N/A
Condo/PUD Approval 10/07/21 Not Applicable 10/07/21 - Crystal
Kaufman
- N/A
Engineering
Item Date Approved Approval Final Comments
Plans 10/13/21 Approved 10/13/21 - Melanie
Jackson
- Approved - See conditions on
approved plans
10/13/21 - Melanie
Jackson
- Approved
Grading & Drainage Plan 10/13/21 Not Applicable 10/13/21 - Melanie
Jackson
- N/A
Storm Water Pollution Prevention
Plan (SWPPP)
10/13/21 Not Applicable 10/13/21 - Melanie
Jackson
- N/A
Utility Plan 10/13/21 Not Applicable 10/13/21 - Melanie
Jackson
- N/A
Site Plan 10/13/21 Approved 10/13/21 - Melanie
Jackson
- Approved
Signed/Stamped Survey 10/13/21 Approved 10/13/21 - Melanie
Jackson
- Approved
Landscape Plan 10/13/21 Approved 10/13/21 - Melanie
Jackson
- Approved
Irrigation Plan 10/13/21 Not Applicable 10/13/21 - Melanie
Jackson
- N/A
Planning
Item Date Approved Approval Final Comments
Plans 10/27/21 Approved 10/27/21 - LIllian
Lederer
- Approved - See plans for notes
Grading & Drainage Plan 10/22/21 Approved 10/22/21 - LIllian
Lederer
- Approved
Site Plan 10/22/21 Approved 10/22/21 - LIllian
Lederer
- Approved
Signed/Stamped Survey 10/22/21 Approved 10/22/21 - LIllian
Lederer
- Approved
Landscape Plan 10/22/21 Approved 10/22/21 - LIllian
Lederer
- Approved
Irrigation Plan 10/27/21 Approved 10/22/21 - LIllian
Lederer
- Rejected - No irrigation plans
attached
10/27/21 - LIllian
Lederer
- Approved
Planning
Code Enforcement
Item Date Approved Approval Final Comments
Construction Mitigation Plan
(CMP)
10/08/21 Approved 10/08/21 - Jordan
Whittaker
- Approved - Please Acknowledge
Attached CMP.
Site Plan 10/08/21 Approved 10/08/21 - Jordan
Whittaker
- Approved - Contractor Signage
must be Displayed, A
Portable t - See
additional Notes
Date of Final Approval: 10/27/21 Approved By: Crystal Kaufman
Additional Comments
Dream Custom LLC TEMP21-1310
Permit #: TEMP21-1310 / Lot 1 / 10 Daly Avenue Sub. / 10 DALY AVE
Code Enforcement
Item Comments
Site Plan 10/08/21 - Jordan
Whittaker
- Approved - Contractor Signage must be Displayed, A
Portable t - See additional Notes
Contractor Signage must be Displayed, A Portable toilet or access to a Restroom must be provided, and a Dumpster or a
Dumpster/Trailer is Required. Will need to Provide an updated site plan Showing LOD Fencing and necessary erosion control
measures, Necessary LOD Fencing and Erosion Control Measures will be Required to be in place BEFORE the LOD Inspection, LOD
Inspection is Required. At No Time will building materials or Dumpsters be allowed to be stored/staged in the public roadway.