Permit 19-245APPROVALS DATE INFO
Plan Review Finalized:Yes 09/30/19 Jennifer Barclay
19-245 (C)
Application Accepted Date: 09/16/2019
CONTACT INFORMATION
APPLICATION DETAILS
753.6 sq. ft.Main Floor: VB R-3 Residential, one- a…
753.6 sq. ft.Second Floor: VB R-3 Residential, one- a…
144 sq. ft.Third Floor: VB R-3 Residential, one- a…
164.22 sq. ft.Deck: VB U Utility, miscellaneous
APPLICATION NUMBER:
This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if
construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. I
here-by certify that I have read and examined this application and know the same to be true and correct. All
provisions of laws and ordinances governing this type of work will be compiled with whether specified herein or not
the granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or
local law regulating construction or the performance of construction and that I make this statement under penalty of
perjury.
Park City
Building Permit Permit #:
Issue Date:
19-245 (C)
10/09/2019
Type of Improvement: Remodel
Description: remodel of finishes
Bldg. Address: 1700 THREE KINGS DR #5
City: Park City State: UT Zip: 84060
Subdivision: Payday Condo Phase:
Block: Lot #: Parcel #: PD-2-C
Property Owner: CHONG B W TRUSTEE P: (480) 710-1388
City: CAVE CREEK State: AZ Zip: 85331
Permit Contact: mark suessman P: (801) 891-1861
Email: mark@blacklabconstruction.com
General Contractor: black lab construction
License #: 8951639-5501 P: (801) 891-1861
Address: 8350 Pointe Rd #I-11
City: Park City State: Utah Zip: 84098
Email: mark@blacklabconstruction.com
Electrical Contractor: Double T Electrical
License #: 10643709-5501 P: (801) 243-1151
Address: 10531 S. Weeping Willow Dr.
City: Sandy State: ut Zip: 84070
Email: double.t.electric1@gmail.com
Plumbing Contractor: All Around Mechanical
License #: 6034371-5501 P: (801) 967-3300
Address: 7730 S. Oak Street #9
City: Midvale State: Ut Zip: 84047
Email: gary.olson@all-aroundmechanical.com
Mechanical Contractor: H&M Heat and Cooling
License #: 5687537-5501 P: (801) 444-3633
Address: PO Box 87
City: Kaysville State: UT Zip: 84037
Email: hmheating@gmail.com
# Bedrooms: 3 # Bathrooms: 3
# Covered Parking: # Stories: 3
Max Occupancy: Fire Sprinkler: No
Const. Material: # of Units: 1,660
$ Construction Valuation 100,000.00
$ Electrical Valuation 2,000.00
$ Plumbing Valuation 4,000.00
$ Mechanical Valuation 400.00
PERMIT FEES
Building Fee $ 1,000.00
Electrical Fee $ 71.35
Mechanical Fee $ 50.00
Plumbing Fee $ 97.25
Building Plan Check Deposit $ 0.00
Plan Check Totals (65% of Permit Fees)$ 650.00
Deposit Credit $ 0.00
Plan Check Fee $ 650.00
State Fee $ 12.19
Total Fees:$ 1,880.79
Setbacks Front:Rear:Left:Right:
Min.
Actual:
Applicant Name:mark suessman
Signature of Builder/Authorized Agent or Owner:Date:
Application Approved By:Date:
Jennifer Barclay 09/30/2019
Permit Issued By:Date:
Dave Thacker 10/09/2019
Receipt #:
2228
Date:
Cash Check # [ ] Credit Card
Date Called In:
04-14-2020
Date Inspect On:
04-17-2020 AM
PM
Park City
445 Marsac Ave
Park City, UT 84060
PHONE # (435) 615-5100
cooper.wade@parkcity.org
COMPLIANCE INSPECTION REPORT
OWNER NAME: CHONG B W TRUSTEE OWNER email:
chong.catherine@mayo.edu
OWNER/BUILDER: black lab construction Requested by: mark suessman
ADDRESS: 1700 THREE KINGS DR #5, Payday Condo Phone #: (801) 891-1861
PERMIT #: 19-245 Email: mark@blacklabconstruction.com
Description: remodel of finishes Permit Type:
Remodel
INSPECTION OF ITEMS LISTED BELOW:
Building Inspections
CONDITION OF INSPECTION:
PASS 13,16 PARTIAL PASS NO PASS 14,15
ITEMIZED AND DESCRIBED AS FOLLOWS:
Rough Framing
OK TO CONTINUE
Rough Electrical
WIRES IN BATH 103 NEEDS ADDRESSED
NAIL PLATES LAUNDRY
Rough Mechanical
BATH FAN NEEDS HARD PIPED MAX 4' FLEX
COMBST AIR FOR FURNACE
HEAT REG NEEDS LOWERED IN LAUNDRY
Rough Plumbing
OK TO CONTINUE
DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR
1. Footings/Piers 2. Foundation 3. Grout/Bond Beam 4. Und. Plumbing
5. Und. Mechanical 6. Und. Electrical 7. Und. Gas Line 8. Slab/Holddowns
9. Slab on Grade 10. Shear Wall 11. Ext. Moisture Barrier 12. Roof Sheathing/Framing
13. Rough Framing
Passed: 04/17/20
14. Rough Electrical
No Pass: 04/17/20
15. Rough Mechanical
No Pass: 04/17/20
16. Rough Plumbing
Passed: 04/17/20
17. Fire Wall 18. Masonry/Stone Veneer 19. Stucco/Ext. Siding 20. Gas Line/Meter Set
21. Insulation 22. Sheetrock 23. Shower Pan 24. Fire Sprinkler
25. Fire Inspection 26. Final Electrical 27. Final Mechanical 28. Final Plumbing
29. Final
04-17-2020 at 11:51:53 AM Cooper Wade
REMODEL PLAN
A. Install new fireplace hearth, mantel, and tile front
B. Install new wood flooring with sound mitigation throughout main
floor's left side (right side has no occupants beneath it)
C. New cabinets and solid surface countertops in kitchen
D. Update all bathrooms with new tile, new vanities and toilets. Install
sound mitigation beneath all tile floors.
E. Add new closet
F. Replace decking material
G. New paint throughout
Page 1 of 3
8'-6 3/4"
8'-2 1/4"4'-11 1/4"6'-6"15'-0"6'-0"3'-10 9/16"12'-0"26'-0"7'-7 1/4"6'-6"4'-11 17/64"11'-11 1/16"11'-11 15/16"
13'-7 15/16"
12'-4 7/16"12'-5"12'-0"
16'-1"10'-2"A
B
C
D
5'-0"3'-6"3'-1 7/16"
D
E
F
Tile
Engineered Wood Floor
4'-6"15'-3 1/2"
Page 2 of 3
12'-0"15'-3 1/2"4'-11 1/4"6'-6"12'-0"11'-11"3'-1"8'-7 1/64"3'-7 3/4"8'-4 7/16"5'-3 1/64"4'-11 17/64"3'-3"
2'-6"2'-10 17/64"2'-6"8'-2 1/4"2'-2"6'-5 1/16"5'-0"3'-0"2'-1"D
E
Page 3 of 3
12'-0"11'-11"9'-3"
2'-9"
3'-5 1/2"
REMODEL PLAN
A. Install new fireplace hearth, mantel, and tile front
B. Install new wood flooring with sound mitigation throughout main
floor's left side (right side has no occupants beneath it)
C. New cabinets and solid surface countertops in kitchen
D. Update all bathrooms with new tile, new vanities and toilets. Install
sound mitigation beneath all tile floors.
E. Add new closet
F. Replace decking material
G. New paint throughout
Page 1 of 3
8'-6 3/4"
8'-2 1/4"4'-11 1/4"6'-6"15'-0"6'-0"3'-10 9/16"12'-0"26'-0"7'-7 1/4"6'-6"4'-11 17/64"11'-11 1/16"11'-11 15/16"
13'-7 15/16"
12'-4 7/16"12'-5"12'-0"
16'-1"10'-2"A
B
C
D
5'-0"3'-6"3'-1 7/16"
D
E
F
Tile
Engineered Wood Floor
4'-6"15'-3 1/2"
Page 2 of 3
12'-0"15'-3 1/2"4'-11 1/4"6'-6"12'-0"11'-11"3'-1"8'-7 1/64"3'-7 3/4"8'-4 7/16"5'-3 1/64"4'-11 17/64"3'-3"
2'-6"2'-10 17/64"2'-6"8'-2 1/4"2'-2"6'-5 1/16"5'-0"3'-0"2'-1"D
E
Page 3 of 3
12'-0"11'-11"9'-3"
2'-9"
3'-5 1/2"
Date Called In:
04-22-2020
Date Inspect On:
04-23-2020 AM
PM
Park City
445 Marsac Ave
Park City, UT 84060
PHONE # (435) 615-5100
glade.fawson@parkcity.org
COMPLIANCE INSPECTION REPORT
OWNER NAME: CHONG B W TRUSTEE OWNER email:
chong.catherine@mayo.edu
OWNER/BUILDER: black lab construction Requested by: mark suessman
ADDRESS: 1700 THREE KINGS DR #5, Payday Condo Phone #: (801) 891-1861
PERMIT #: 19-245 Email: mark@blacklabconstruction.com
Description: remodel of finishes Permit Type:
Remodel
INSPECTION OF ITEMS LISTED BELOW:
Building Inspections
CONDITION OF INSPECTION:
PASS PARTIAL PASS NO PASS 14,15
ITEMIZED AND DESCRIBED AS FOLLOWS:
Rough Electrical
Unable to locate - legal discription unit number and actual onsite unit numbers don't match
DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR
1. Footings/Piers 2. Foundation 3. Grout/Bond Beam 4. Und. Plumbing
5. Und. Mechanical 6. Und. Electrical 7. Und. Gas Line 8. Slab/Holddowns
9. Slab on Grade 10. Shear Wall 11. Ext. Moisture Barrier 12. Roof Sheathing/Framing
13. Rough Framing
Passed: 04/17/20
14. Rough Electrical - re
No Pass: 04/23/20
15. Rough Mechanical - re
No Pass: 04/23/20
16. Rough Plumbing
Passed: 04/17/20
17. Fire Wall 18. Masonry/Stone Veneer 19. Stucco/Ext. Siding 20. Gas Line/Meter Set
21. Insulation 22. Sheetrock 23. Shower Pan 24. Fire Sprinkler
25. Fire Inspection 26. Final Electrical 27. Final Mechanical 28. Final Plumbing
29. Final
04-23-2020 at 10:59:29 AM Glade Fawson
Date Called In:
04-22-2020
Date Inspect On:
04-23-2020 AM
PM
Park City
445 Marsac Ave
Park City, UT 84060
PHONE # (435) 615-5100
glade.fawson@parkcity.org
COMPLIANCE INSPECTION REPORT
OWNER NAME: CHONG B W TRUSTEE OWNER email:
chong.catherine@mayo.edu
OWNER/BUILDER: black lab construction Requested by: mark suessman
ADDRESS: 1700 THREE KINGS DR #5, Payday Condo Phone #: (801) 891-1861
PERMIT #: 19-245 Email: mark@blacklabconstruction.com
Description: remodel of finishes Permit Type:
Remodel
INSPECTION OF ITEMS LISTED BELOW:
Building Inspections
CONDITION OF INSPECTION:
PASS PARTIAL PASS NO PASS 21
ITEMIZED AND DESCRIBED AS FOLLOWS:
Insulation
Unable to locate - legal discription unit number and actual onsite unit numbers don't match
DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR
1. Footings/Piers 2. Foundation 3. Grout/Bond Beam 4. Und. Plumbing
5. Und. Mechanical 6. Und. Electrical 7. Und. Gas Line 8. Slab/Holddowns
9. Slab on Grade 10. Shear Wall 11. Ext. Moisture Barrier 12. Roof Sheathing/Framing
13. Rough Framing
Passed: 04/17/20
14. Rough Electrical
No Pass: 04/23/20
15. Rough Mechanical
No Pass: 04/23/20
16. Rough Plumbing
Passed: 04/17/20
17. Fire Wall 18. Masonry/Stone Veneer 19. Stucco/Ext. Siding 20. Gas Line/Meter Set
21. Insulation
No Pass: 04/23/20
22. Sheetrock 23. Shower Pan 24. Fire Sprinkler
25. Fire Inspection 26. Final Electrical 27. Final Mechanical 28. Final Plumbing
29. Final
04-23-2020 at 11:00:27 AM Glade Fawson
Date Called In:
04-23-2020
Date Inspect On:
04-27-2020 AM
PM
Park City
445 Marsac Ave
Park City, UT 84060
PHONE # (435) 615-5100
cooper.wade@parkcity.org
COMPLIANCE INSPECTION REPORT
OWNER NAME: CHONG B W TRUSTEE OWNER email:
chong.catherine@mayo.edu
OWNER/BUILDER: black lab construction Requested by: mark suessman
ADDRESS: 1700 THREE KINGS DR #5, Payday Condo Phone #: (801) 891-1861
PERMIT #: 19-245 Email: mark@blacklabconstruction.com
Description: remodel of finishes Permit Type:
Remodel
INSPECTION OF ITEMS LISTED BELOW:
Building Inspections
CONDITION OF INSPECTION:
PASS 14,15,21 PARTIAL PASS NO PASS
ITEMIZED AND DESCRIBED AS FOLLOWS:
Rough Electrical
VIOLATIONS CORRECTED
Rough Mechanical
VIOLATIONS CORRECTED
Insulation
ROCK WOOL R-21 WALLS
OK TO CONTINUE
DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR
1. Footings/Piers 2. Foundation 3. Grout/Bond Beam 4. Und. Plumbing
5. Und. Mechanical 6. Und. Electrical 7. Und. Gas Line 8. Slab/Holddowns
9. Slab on Grade 10. Shear Wall 11. Ext. Moisture Barrier 12. Roof Sheathing/Framing
13. Rough Framing
Passed: 04/17/20
14. Rough Electrical - re
Passed: 04/27/20
15. Rough Mechanical - re
Passed: 04/27/20
16. Rough Plumbing
Passed: 04/17/20
17. Fire Wall 18. Masonry/Stone Veneer 19. Stucco/Ext. Siding 20. Gas Line/Meter Set
21. Insulation - re
Passed: 04/27/20
22. Sheetrock 23. Shower Pan 24. Fire Sprinkler
25. Fire Inspection 26. Final Electrical 27. Final Mechanical 28. Final Plumbing
29. Final
04-27-2020 at 09:54:50 AM Cooper Wade
Date Called In:
01-18-2021
Date Inspect On:
01-21-2021 AM
PM
Park City
445 Marsac Ave
Park City, UT 84060
PHONE # (435) 615-5100
glade.fawson@parkcity.org
COMPLIANCE INSPECTION REPORT
OWNER NAME: CHONG B W TRUSTEE OWNER email: chong.catherine@mayo.edu
OWNER/BUILDER: black lab construction Requested by: mark suessman
ADDRESS: 1700 THREE KINGS DR #5, Payday Condo , Park City Phone #: (801) 891-1861
PERMIT #: 19-245 Email: mark@blacklabconstruction.com
Description: remodel of finishes Permit Type: Remodel
INSPECTION OF ITEMS LISTED BELOW:
Building Inspections
CONDITION OF INSPECTION:
PASS PARTIAL PASS
NO PASS 33
ITEMIZED AND DESCRIBED AS FOLLOWS:
general comments:
Final Inspection (Building)
Unit 161
1. cannot have a pendent light over the tub.
DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR
1. Radiant Tubing 2. Roof Framing 3. Roof Sheathing 4. Footings/Piers
5. Foundation 6. Grout/Bond Beam 7. Und. Plumbing 8. Und. Mechanical
9. Und. Electrical 10. Und. Gas Line 11. Slab/Holddowns 12. Slab on Grade
13. Shear Wall 14. Ext. Moisture Barrier 15. Rough Framing
Passed: 04/17/20
16. Rough Electrical
Passed: 04/27/20
17. Rough Mechanical
Passed: 04/27/20
18. Rough Plumbing
Passed: 04/17/20
19. Fire Wall 20. Masonry/Stone Veneer
21. Stucco/Ext. Siding 22. Gas Line/Meter Set 23. Insulation
Passed: 04/27/20
24. Sheetrock
25. Shower Pan 26. Fire Sprinkler 27. Power to Panel 28. Final Electrical
29. Final Mechanical 30. Final Plumbing 31. Final Fire Inspection 32. Pre-Final Site Visit
33. Final Inspection (Building)
No Pass: 01/21/21
34. Final Inspection (Planning)
01-21-2021 at 10:30:26 AM Glade Fawson
Date Called In:
02-02-2021
Date Inspect On:
02-05-2021 AM
PM
Park City
445 Marsac Ave
Park City, UT 84060
PHONE # (435) 615-5100
bryan.arnold@parkcity.org
COMPLIANCE INSPECTION REPORT
OWNER NAME: CHONG B W TRUSTEE OWNER email: chong.catherine@mayo.edu
OWNER/BUILDER: black lab construction Requested by: mark suessman
ADDRESS: 1700 THREE KINGS DR #5, Payday Condo , Park City Phone #: (801) 891-1861
PERMIT #: 19-245 Email: mark@blacklabconstruction.com
Description: remodel of finishes Permit Type: Remodel
INSPECTION OF ITEMS LISTED BELOW:
Building Inspections
CONDITION OF INSPECTION:
PASS 33 PARTIAL PASS
NO PASS
ITEMIZED AND DESCRIBED AS FOLLOWS:
Final Inspection (Building)
Pendant light removed, can light installed
Okay to close
DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR
1. Radiant Tubing 2. Roof Framing 3. Roof Sheathing 4. Footings/Piers
5. Foundation 6. Grout/Bond Beam 7. Und. Plumbing 8. Und. Mechanical
9. Und. Electrical 10. Und. Gas Line 11. Slab/Holddowns 12. Slab on Grade
13. Shear Wall 14. Ext. Moisture Barrier 15. Rough Framing
Passed: 04/17/20
16. Rough Electrical
Passed: 04/27/20
17. Rough Mechanical
Passed: 04/27/20
18. Rough Plumbing
Passed: 04/17/20
19. Fire Wall 20. Masonry/Stone Veneer
21. Stucco/Ext. Siding 22. Gas Line/Meter Set 23. Insulation
Passed: 04/27/20
24. Sheetrock
25. Shower Pan 26. Fire Sprinkler 27. Power to Panel 28. Final Electrical
29. Final Mechanical 30. Final Plumbing 31. Final Fire Inspection 32. Pre-Final Site Visit
33. Final Inspection (Building) - re
Passed: 02/05/21
34. Final Inspection (Planning)
02-05-2021 at 08:26:36 AM Bryan Arnold