Loading...
Permit 19-245APPROVALS DATE INFO Plan Review Finalized:Yes 09/30/19 Jennifer Barclay 19-245 (C) Application Accepted Date: 09/16/2019 CONTACT INFORMATION APPLICATION DETAILS 753.6 sq. ft.Main Floor: VB R-3 Residential, one- a… 753.6 sq. ft.Second Floor: VB R-3 Residential, one- a… 144 sq. ft.Third Floor: VB R-3 Residential, one- a… 164.22 sq. ft.Deck: VB U Utility, miscellaneous APPLICATION NUMBER: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. I here-by certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be compiled with whether specified herein or not the granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction and that I make this statement under penalty of perjury. Park City Building Permit Permit #: Issue Date: 19-245 (C) 10/09/2019 Type of Improvement: Remodel Description: remodel of finishes Bldg. Address: 1700 THREE KINGS DR #5 City: Park City State: UT Zip: 84060 Subdivision: Payday Condo Phase: Block: Lot #: Parcel #: PD-2-C Property Owner: CHONG B W TRUSTEE P: (480) 710-1388 City: CAVE CREEK State: AZ Zip: 85331 Permit Contact: mark suessman P: (801) 891-1861 Email: mark@blacklabconstruction.com General Contractor: black lab construction License #: 8951639-5501 P: (801) 891-1861 Address: 8350 Pointe Rd #I-11 City: Park City State: Utah Zip: 84098 Email: mark@blacklabconstruction.com Electrical Contractor: Double T Electrical License #: 10643709-5501 P: (801) 243-1151 Address: 10531 S. Weeping Willow Dr. City: Sandy State: ut Zip: 84070 Email: double.t.electric1@gmail.com Plumbing Contractor: All Around Mechanical License #: 6034371-5501 P: (801) 967-3300 Address: 7730 S. Oak Street #9 City: Midvale State: Ut Zip: 84047 Email: gary.olson@all-aroundmechanical.com Mechanical Contractor: H&M Heat and Cooling License #: 5687537-5501 P: (801) 444-3633 Address: PO Box 87 City: Kaysville State: UT Zip: 84037 Email: hmheating@gmail.com # Bedrooms: 3 # Bathrooms: 3 # Covered Parking: # Stories: 3 Max Occupancy: Fire Sprinkler: No Const. Material: # of Units: 1,660 $ Construction Valuation 100,000.00 $ Electrical Valuation 2,000.00 $ Plumbing Valuation 4,000.00 $ Mechanical Valuation 400.00 PERMIT FEES Building Fee $ 1,000.00 Electrical Fee $ 71.35 Mechanical Fee $ 50.00 Plumbing Fee $ 97.25 Building Plan Check Deposit $ 0.00 Plan Check Totals (65% of Permit Fees)$ 650.00 Deposit Credit $ 0.00 Plan Check Fee $ 650.00 State Fee $ 12.19 Total Fees:$ 1,880.79 Setbacks Front:Rear:Left:Right: Min. Actual: Applicant Name:mark suessman Signature of Builder/Authorized Agent or Owner:Date: Application Approved By:Date: Jennifer Barclay 09/30/2019 Permit Issued By:Date: Dave Thacker 10/09/2019 Receipt #: 2228 Date: Cash Check # [ ] Credit Card Date Called In: 04-14-2020 Date Inspect On: 04-17-2020 AM PM Park City 445 Marsac Ave Park City, UT 84060 PHONE # (435) 615-5100 cooper.wade@parkcity.org COMPLIANCE INSPECTION REPORT OWNER NAME: CHONG B W TRUSTEE OWNER email: chong.catherine@mayo.edu OWNER/BUILDER: black lab construction Requested by: mark suessman ADDRESS: 1700 THREE KINGS DR #5, Payday Condo Phone #: (801) 891-1861 PERMIT #: 19-245 Email: mark@blacklabconstruction.com Description: remodel of finishes Permit Type: Remodel INSPECTION OF ITEMS LISTED BELOW: Building Inspections CONDITION OF INSPECTION: PASS 13,16 PARTIAL PASS NO PASS 14,15 ITEMIZED AND DESCRIBED AS FOLLOWS: Rough Framing OK TO CONTINUE Rough Electrical WIRES IN BATH 103 NEEDS ADDRESSED NAIL PLATES LAUNDRY Rough Mechanical BATH FAN NEEDS HARD PIPED MAX 4' FLEX COMBST AIR FOR FURNACE HEAT REG NEEDS LOWERED IN LAUNDRY Rough Plumbing OK TO CONTINUE DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR 1. Footings/Piers 2. Foundation 3. Grout/Bond Beam 4. Und. Plumbing 5. Und. Mechanical 6. Und. Electrical 7. Und. Gas Line 8. Slab/Holddowns 9. Slab on Grade 10. Shear Wall 11. Ext. Moisture Barrier 12. Roof Sheathing/Framing 13. Rough Framing Passed: 04/17/20 14. Rough Electrical No Pass: 04/17/20 15. Rough Mechanical No Pass: 04/17/20 16. Rough Plumbing Passed: 04/17/20 17. Fire Wall 18. Masonry/Stone Veneer 19. Stucco/Ext. Siding 20. Gas Line/Meter Set 21. Insulation 22. Sheetrock 23. Shower Pan 24. Fire Sprinkler 25. Fire Inspection 26. Final Electrical 27. Final Mechanical 28. Final Plumbing 29. Final 04-17-2020 at 11:51:53 AM Cooper Wade REMODEL PLAN A. Install new fireplace hearth, mantel, and tile front B. Install new wood flooring with sound mitigation throughout main floor's left side (right side has no occupants beneath it) C. New cabinets and solid surface countertops in kitchen D. Update all bathrooms with new tile, new vanities and toilets. Install sound mitigation beneath all tile floors. E. Add new closet F. Replace decking material G. New paint throughout Page 1 of 3 8'-6 3/4" 8'-2 1/4"4'-11 1/4"6'-6"15'-0"6'-0"3'-10 9/16"12'-0"26'-0"7'-7 1/4"6'-6"4'-11 17/64"11'-11 1/16"11'-11 15/16" 13'-7 15/16" 12'-4 7/16"12'-5"12'-0" 16'-1"10'-2"A B C D 5'-0"3'-6"3'-1 7/16" D E F Tile Engineered Wood Floor 4'-6"15'-3 1/2" Page 2 of 3 12'-0"15'-3 1/2"4'-11 1/4"6'-6"12'-0"11'-11"3'-1"8'-7 1/64"3'-7 3/4"8'-4 7/16"5'-3 1/64"4'-11 17/64"3'-3" 2'-6"2'-10 17/64"2'-6"8'-2 1/4"2'-2"6'-5 1/16"5'-0"3'-0"2'-1"D E Page 3 of 3 12'-0"11'-11"9'-3" 2'-9" 3'-5 1/2" REMODEL PLAN A. Install new fireplace hearth, mantel, and tile front B. Install new wood flooring with sound mitigation throughout main floor's left side (right side has no occupants beneath it) C. New cabinets and solid surface countertops in kitchen D. Update all bathrooms with new tile, new vanities and toilets. Install sound mitigation beneath all tile floors. E. Add new closet F. Replace decking material G. New paint throughout Page 1 of 3 8'-6 3/4" 8'-2 1/4"4'-11 1/4"6'-6"15'-0"6'-0"3'-10 9/16"12'-0"26'-0"7'-7 1/4"6'-6"4'-11 17/64"11'-11 1/16"11'-11 15/16" 13'-7 15/16" 12'-4 7/16"12'-5"12'-0" 16'-1"10'-2"A B C D 5'-0"3'-6"3'-1 7/16" D E F Tile Engineered Wood Floor 4'-6"15'-3 1/2" Page 2 of 3 12'-0"15'-3 1/2"4'-11 1/4"6'-6"12'-0"11'-11"3'-1"8'-7 1/64"3'-7 3/4"8'-4 7/16"5'-3 1/64"4'-11 17/64"3'-3" 2'-6"2'-10 17/64"2'-6"8'-2 1/4"2'-2"6'-5 1/16"5'-0"3'-0"2'-1"D E Page 3 of 3 12'-0"11'-11"9'-3" 2'-9" 3'-5 1/2" Date Called In: 04-22-2020 Date Inspect On: 04-23-2020 AM PM Park City 445 Marsac Ave Park City, UT 84060 PHONE # (435) 615-5100 glade.fawson@parkcity.org COMPLIANCE INSPECTION REPORT OWNER NAME: CHONG B W TRUSTEE OWNER email: chong.catherine@mayo.edu OWNER/BUILDER: black lab construction Requested by: mark suessman ADDRESS: 1700 THREE KINGS DR #5, Payday Condo Phone #: (801) 891-1861 PERMIT #: 19-245 Email: mark@blacklabconstruction.com Description: remodel of finishes Permit Type: Remodel INSPECTION OF ITEMS LISTED BELOW: Building Inspections CONDITION OF INSPECTION: PASS PARTIAL PASS NO PASS 14,15 ITEMIZED AND DESCRIBED AS FOLLOWS: Rough Electrical Unable to locate - legal discription unit number and actual onsite unit numbers don't match DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR 1. Footings/Piers 2. Foundation 3. Grout/Bond Beam 4. Und. Plumbing 5. Und. Mechanical 6. Und. Electrical 7. Und. Gas Line 8. Slab/Holddowns 9. Slab on Grade 10. Shear Wall 11. Ext. Moisture Barrier 12. Roof Sheathing/Framing 13. Rough Framing Passed: 04/17/20 14. Rough Electrical - re No Pass: 04/23/20 15. Rough Mechanical - re No Pass: 04/23/20 16. Rough Plumbing Passed: 04/17/20 17. Fire Wall 18. Masonry/Stone Veneer 19. Stucco/Ext. Siding 20. Gas Line/Meter Set 21. Insulation 22. Sheetrock 23. Shower Pan 24. Fire Sprinkler 25. Fire Inspection 26. Final Electrical 27. Final Mechanical 28. Final Plumbing 29. Final 04-23-2020 at 10:59:29 AM Glade Fawson Date Called In: 04-22-2020 Date Inspect On: 04-23-2020 AM PM Park City 445 Marsac Ave Park City, UT 84060 PHONE # (435) 615-5100 glade.fawson@parkcity.org COMPLIANCE INSPECTION REPORT OWNER NAME: CHONG B W TRUSTEE OWNER email: chong.catherine@mayo.edu OWNER/BUILDER: black lab construction Requested by: mark suessman ADDRESS: 1700 THREE KINGS DR #5, Payday Condo Phone #: (801) 891-1861 PERMIT #: 19-245 Email: mark@blacklabconstruction.com Description: remodel of finishes Permit Type: Remodel INSPECTION OF ITEMS LISTED BELOW: Building Inspections CONDITION OF INSPECTION: PASS PARTIAL PASS NO PASS 21 ITEMIZED AND DESCRIBED AS FOLLOWS: Insulation Unable to locate - legal discription unit number and actual onsite unit numbers don't match DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR 1. Footings/Piers 2. Foundation 3. Grout/Bond Beam 4. Und. Plumbing 5. Und. Mechanical 6. Und. Electrical 7. Und. Gas Line 8. Slab/Holddowns 9. Slab on Grade 10. Shear Wall 11. Ext. Moisture Barrier 12. Roof Sheathing/Framing 13. Rough Framing Passed: 04/17/20 14. Rough Electrical No Pass: 04/23/20 15. Rough Mechanical No Pass: 04/23/20 16. Rough Plumbing Passed: 04/17/20 17. Fire Wall 18. Masonry/Stone Veneer 19. Stucco/Ext. Siding 20. Gas Line/Meter Set 21. Insulation No Pass: 04/23/20 22. Sheetrock 23. Shower Pan 24. Fire Sprinkler 25. Fire Inspection 26. Final Electrical 27. Final Mechanical 28. Final Plumbing 29. Final 04-23-2020 at 11:00:27 AM Glade Fawson Date Called In: 04-23-2020 Date Inspect On: 04-27-2020 AM PM Park City 445 Marsac Ave Park City, UT 84060 PHONE # (435) 615-5100 cooper.wade@parkcity.org COMPLIANCE INSPECTION REPORT OWNER NAME: CHONG B W TRUSTEE OWNER email: chong.catherine@mayo.edu OWNER/BUILDER: black lab construction Requested by: mark suessman ADDRESS: 1700 THREE KINGS DR #5, Payday Condo Phone #: (801) 891-1861 PERMIT #: 19-245 Email: mark@blacklabconstruction.com Description: remodel of finishes Permit Type: Remodel INSPECTION OF ITEMS LISTED BELOW: Building Inspections CONDITION OF INSPECTION: PASS 14,15,21 PARTIAL PASS NO PASS ITEMIZED AND DESCRIBED AS FOLLOWS: Rough Electrical VIOLATIONS CORRECTED Rough Mechanical VIOLATIONS CORRECTED Insulation ROCK WOOL R-21 WALLS OK TO CONTINUE DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR 1. Footings/Piers 2. Foundation 3. Grout/Bond Beam 4. Und. Plumbing 5. Und. Mechanical 6. Und. Electrical 7. Und. Gas Line 8. Slab/Holddowns 9. Slab on Grade 10. Shear Wall 11. Ext. Moisture Barrier 12. Roof Sheathing/Framing 13. Rough Framing Passed: 04/17/20 14. Rough Electrical - re Passed: 04/27/20 15. Rough Mechanical - re Passed: 04/27/20 16. Rough Plumbing Passed: 04/17/20 17. Fire Wall 18. Masonry/Stone Veneer 19. Stucco/Ext. Siding 20. Gas Line/Meter Set 21. Insulation - re Passed: 04/27/20 22. Sheetrock 23. Shower Pan 24. Fire Sprinkler 25. Fire Inspection 26. Final Electrical 27. Final Mechanical 28. Final Plumbing 29. Final 04-27-2020 at 09:54:50 AM Cooper Wade Date Called In: 01-18-2021 Date Inspect On: 01-21-2021 AM PM Park City 445 Marsac Ave Park City, UT 84060 PHONE # (435) 615-5100 glade.fawson@parkcity.org COMPLIANCE INSPECTION REPORT OWNER NAME: CHONG B W TRUSTEE OWNER email: chong.catherine@mayo.edu OWNER/BUILDER: black lab construction Requested by: mark suessman ADDRESS: 1700 THREE KINGS DR #5, Payday Condo , Park City Phone #: (801) 891-1861 PERMIT #: 19-245 Email: mark@blacklabconstruction.com Description: remodel of finishes Permit Type: Remodel INSPECTION OF ITEMS LISTED BELOW: Building Inspections CONDITION OF INSPECTION: PASS PARTIAL PASS NO PASS 33 ITEMIZED AND DESCRIBED AS FOLLOWS: general comments: Final Inspection (Building) Unit 161 1. cannot have a pendent light over the tub. DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR 1. Radiant Tubing 2. Roof Framing 3. Roof Sheathing 4. Footings/Piers 5. Foundation 6. Grout/Bond Beam 7. Und. Plumbing 8. Und. Mechanical 9. Und. Electrical 10. Und. Gas Line 11. Slab/Holddowns 12. Slab on Grade 13. Shear Wall 14. Ext. Moisture Barrier 15. Rough Framing Passed: 04/17/20 16. Rough Electrical Passed: 04/27/20 17. Rough Mechanical Passed: 04/27/20 18. Rough Plumbing Passed: 04/17/20 19. Fire Wall 20. Masonry/Stone Veneer 21. Stucco/Ext. Siding 22. Gas Line/Meter Set 23. Insulation Passed: 04/27/20 24. Sheetrock 25. Shower Pan 26. Fire Sprinkler 27. Power to Panel 28. Final Electrical 29. Final Mechanical 30. Final Plumbing 31. Final Fire Inspection 32. Pre-Final Site Visit 33. Final Inspection (Building) No Pass: 01/21/21 34. Final Inspection (Planning) 01-21-2021 at 10:30:26 AM Glade Fawson Date Called In: 02-02-2021 Date Inspect On: 02-05-2021 AM PM Park City 445 Marsac Ave Park City, UT 84060 PHONE # (435) 615-5100 bryan.arnold@parkcity.org COMPLIANCE INSPECTION REPORT OWNER NAME: CHONG B W TRUSTEE OWNER email: chong.catherine@mayo.edu OWNER/BUILDER: black lab construction Requested by: mark suessman ADDRESS: 1700 THREE KINGS DR #5, Payday Condo , Park City Phone #: (801) 891-1861 PERMIT #: 19-245 Email: mark@blacklabconstruction.com Description: remodel of finishes Permit Type: Remodel INSPECTION OF ITEMS LISTED BELOW: Building Inspections CONDITION OF INSPECTION: PASS 33 PARTIAL PASS NO PASS ITEMIZED AND DESCRIBED AS FOLLOWS: Final Inspection (Building) Pendant light removed, can light installed Okay to close DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR 1. Radiant Tubing 2. Roof Framing 3. Roof Sheathing 4. Footings/Piers 5. Foundation 6. Grout/Bond Beam 7. Und. Plumbing 8. Und. Mechanical 9. Und. Electrical 10. Und. Gas Line 11. Slab/Holddowns 12. Slab on Grade 13. Shear Wall 14. Ext. Moisture Barrier 15. Rough Framing Passed: 04/17/20 16. Rough Electrical Passed: 04/27/20 17. Rough Mechanical Passed: 04/27/20 18. Rough Plumbing Passed: 04/17/20 19. Fire Wall 20. Masonry/Stone Veneer 21. Stucco/Ext. Siding 22. Gas Line/Meter Set 23. Insulation Passed: 04/27/20 24. Sheetrock 25. Shower Pan 26. Fire Sprinkler 27. Power to Panel 28. Final Electrical 29. Final Mechanical 30. Final Plumbing 31. Final Fire Inspection 32. Pre-Final Site Visit 33. Final Inspection (Building) - re Passed: 02/05/21 34. Final Inspection (Planning) 02-05-2021 at 08:26:36 AM Bryan Arnold