Loading...
22-317 RemodelAPPROVALS DATE INFO Plan Review Finalized:Yes 04/21/22 Clara Uchoa 22-317 (C) Application Accepted Date: 04/15/2022 CONTACT INFORMATION APPLICATION DETAILS 1000 sq. ft.Main Floor: VB R-3 Residential, one- a… 985 sq. ft.Basement: VB R-3 Residential, one- a… 400 sq. ft.Garage: VB U Utility, miscellaneous 300 sq. ft.Deck: VB U Utility, miscellaneous APPLICATION NUMBER: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. I here-by certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be compiled with whether specified herein or not the granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction and that I make this statement under penalty of perjury. Park City Building Permit Permit #: Issue Date: 22-317 (C) 04/21/2022 Type of Improvement: Remodel Description: We want to pull permits for final inspection Bldg. Address: 2651 LITTLE KATE RD City: Park City State: UT Zip: 84060 Subdivision: Park Meadows Sub. No. 1 Phase: Block: Lot #: 11 Parcel #: PKM-11 Property Owner: CLOTFELTER SHARON GEORGENEP: (801) 946-1211 City: PARK CITY State: UT Zip: 84060 Permit Contact: Jose coronado P: (385) 227-4585 Email: coronadojose27@gmail.com General Contractor: J&i remodeling corp License #: 178421378 P: (385) 227-4585 Address: 2875 n hillfield rd #63 City: Layton State: Ut Zip: 84041 Email: Coronadojose27@gmail.com Electrical Contractor: Parallel construction llc License #: 12596711-5501 P: City: State: Zip: Plumbing Contractor: License #: P: City: State: Zip: Email: Mechanical Contractor: Right Call heating and A/C llc License #: 7380041-5501 P: City: State: Zip: Email: # Bedrooms: 4 # Bathrooms: 2.5 # Covered Parking: 1 # Stories: Max Occupancy: Fire Sprinkler: No Const. Material: # of Units: 0 $ Construction Valuation 0.00 $ Electrical Valuation 0.00 $ Plumbing Valuation 0.00 $ Mechanical Valuation 0.00 PERMIT FEES Building Fee $ 217.21 Electrical Fee $ 56.10 Mechanical Fee $ 0.00 Plumbing Fee $ 50.00 Building Plan Check Deposit $ 0.00 Plan Check Totals (65% of Permit Fees)$ 141.19 Deposit Credit $ 0.00 Plan Check Fee $ 141.19 State Fee $ 3.23 Total Fees:$ 467.73 Setbacks Front:Rear:Left:Right: Min. Actual: Applicant Name:J&i remodeling Signature of Builder/Authorized Agent or Owner:Date: J&I remodeling corp 04/21/2022 Application Approved By:Date: Clara Uchoa 04/21/2022 Permit Issued By:Date: Dave Thacker 04/21/2022 Receipt #: 10047 Date: Cash Check # [] Credit Card Date Called In: 04-25-2022 Date Inspect On: 04-26-2022 AM PM Park City 445 Marsac Ave Park City, UT 84060 PHONE # (435) 615-5100 inspections@parkcity.org COMPLIANCE INSPECTION REPORT OWNER NAME: CLOTFELTER SHARON GEORGENE OWNER email: mpeay@wedgewood-inc.com OWNER/BUILDER: J&i remodeling corp Requested by: ADDRESS: 2651 LITTLE KATE RD, Park Meadows Sub. No. 1 , Lot # 11 , Park City Phone #: PERMIT #: 22-317 Email: Description: We want to pull permits for final inspection Permit Type: Remodel INSPECTION OF ITEMS LISTED BELOW: Building Inspections CONDITION OF INSPECTION: PASS PARTIAL PASS 14,25 NO PASS 15,16,17,18,24 ITEMIZED AND DESCRIBED AS FOLLOWS: Rough Plumbing Plumbing inspection was not performed on the changes from tub to shower in master bath. Can not ensure was done to code or will not leak. Need to install escutcheons on all plumbing under sinks. Finish installing wet bar sink. Rough Mechanical Need too have a licensed mechanical contractor on record for the mechanical work that has been done uploaded to permit. Set new condenser. Seal around line set penetration. Rough Electrical Need to have a licensed electrical contractor on record for the electrical work that has been done uploaded to permit. Properly hang and caulk all exterior lights. Outlets in kitchen do not work, are not all gfci protected, and are improperly wired. Need to install proper electrical boxes and box extensions in kitchen. Fridge outlet is loose. Install the dishwasher. Install island outlet. Inspection not performed in master bath when second outlet was added. Need to install tamperproof outlets throughout. Wet bar outlets need to be gfci protected and have box extensions including disposal outlet. Secure wires in mechanical closet. Need to check connections in electrical panel and have code compliant screws for panel cover. Need to install carbon and smoke detectors to code. hard wired and interconnected. Garage outlets are loose and not gfci protected. Need to verify light box is fan rated in master bedroom. 1. Radiant Tubing 2. Roof Framing 3. Roof Sheathing 4. Footings/Piers 5. Foundation 6. Grout/Bond Beam 7. Und. Plumbing 8. Und. Mechanical 9. Und. Electrical 10. Und. Gas Line 11. Slab/Holddowns 12. Slab on Grade 13. Shear Wall 14. Ext. Moisture Barrier Partial Pass: 04/27/22 15. Rough Framing No Pass: 04/27/22 16. Rough Electrical No Pass: 04/27/22 17. Rough Mechanical No Pass: 04/27/22 18. Rough Plumbing No Pass: 04/27/22 19. Fire Wall 20. Masonry/Stone Veneer 21. Stucco/Ext. Siding 22. Gas Line/Meter Set 23. Insulation 24. Sheetrock No Pass: 04/27/22 25. Shower Pan Partial Pass: 04/27/22 26. Fire Sprinkler 27. Power to Panel 28. Final Electrical 29. Final Mechanical 30. Final Plumbing 31. Final Fire Inspection 32. Pre-Final Site Visit 33. Final Inspection (Building)34. Final Inspection (Planning) Need an enclosed bulb fixture under stairs. Rough Framing Front exterior stairs have greater than 4" gap in rise. Front exterior stairs wood can not be in contact with the dirt. Need handrail on at least on side of the front exterior stairs. Need engineer to address porch cover over front porch. Need guard rail and hand rail installed in garage. Ext. Moisture Barrier Windows were replaced without flashing inspection. can not verify done correctly. Sheetrock Need to drywall under stairs. Drywall inspection was not performed throughout rest of the house can not verify it was done to code. Shower Pan Shower pan inspection was not performed. Can not inspect liner as the tile is complete. DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR 2022-04-27 07:58:45 Bendy Olsen Date Called In: 05-11-2022 Date Inspect On: 05-17-2022 AM PM Park City 445 Marsac Ave Park City, UT 84060 PHONE # (435) 615-5100 inspections@parkcity.org COMPLIANCE INSPECTION REPORT OWNER NAME: CLOTFELTER SHARON GEORGENE OWNER email: mpeay@wedgewood-inc.com OWNER/BUILDER: J&i remodeling corp Requested by: ADDRESS: 2651 LITTLE KATE RD, Park Meadows Sub. No. 1 , Lot # 11 , Park City Phone #: PERMIT #: 22-317 Email: Description: We want to pull permits for final inspection Permit Type: Remodel INSPECTION OF ITEMS LISTED BELOW: Building Inspections CONDITION OF INSPECTION: PASS 17 PARTIAL PASS NO PASS 15,16,18 ITEMIZED AND DESCRIBED AS FOLLOWS: Rough Framing Need handrail for front stairs. Waterproof front porch and stairs. Verify all bathroom windows are tempered. Rough Electrical Base south east bed south wall outlet is loose. Fridge outlet is loose. Label electrical panel. Lower outlet in wet bar needs to be gfi protected. Max breaker for condenser is 25 amps Rough Plumbing Base bath needs to seal around plumbing. DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR 1. Radiant Tubing 2. Roof Framing 3. Roof Sheathing 4. Footings/Piers 5. Foundation 6. Grout/Bond Beam 7. Und. Plumbing 8. Und. Mechanical 9. Und. Electrical 10. Und. Gas Line 11. Slab/Holddowns 12. Slab on Grade 13. Shear Wall 14. Ext. Moisture Barrier Partial Pass: 04/27/22 15. Rough Framing - re No Pass: 05/17/22 16. Rough Electrical - re No Pass: 05/17/22 17. Rough Mechanical - re Passed: 05/17/22 18. Rough Plumbing - re No Pass: 05/17/22 19. Fire Wall 20. Masonry/Stone Veneer 21. Stucco/Ext. Siding 22. Gas Line/Meter Set 23. Insulation 24. Sheetrock No Pass: 04/27/22 25. Shower Pan Partial Pass: 04/27/22 26. Fire Sprinkler 27. Power to Panel 28. Final Electrical 29. Final Mechanical 30. Final Plumbing 31. Final Fire Inspection 32. Pre-Final Site Visit 33. Final Inspection (Building)34. Final Inspection (Planning) 2022-05-17 16:05:27 Bendy Olsen Date Called In: 05-24-2022 Date Inspect On: 05-24-2022 AM PM Park City 445 Marsac Ave Park City, UT 84060 PHONE # (435) 615-5100 inspections@parkcity.org COMPLIANCE INSPECTION REPORT OWNER NAME: CLOTFELTER SHARON GEORGENE OWNER email: mpeay@wedgewood-inc.com OWNER/BUILDER: J&i remodeling corp Requested by: ADDRESS: 2651 LITTLE KATE RD, Park Meadows Sub. No. 1 , Lot # 11 , Park City Phone #: PERMIT #: 22-317 Email: Description: We want to pull permits for final inspection Permit Type: Remodel INSPECTION OF ITEMS LISTED BELOW: Building Inspections CONDITION OF INSPECTION: PASS PARTIAL PASS NO PASS 15 ITEMIZED AND DESCRIBED AS FOLLOWS: Rough Framing Need handrail for front stairs. Waterproof front porch and stairs. DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR 1. Radiant Tubing 2. Roof Framing 3. Roof Sheathing 4. Footings/Piers 5. Foundation 6. Grout/Bond Beam 7. Und. Plumbing 8. Und. Mechanical 9. Und. Electrical 10. Und. Gas Line 11. Slab/Holddowns 12. Slab on Grade 13. Shear Wall 14. Ext. Moisture Barrier Partial Pass: 04/27/22 15. Rough Framing - re No Pass: 05/24/22 16. Rough Electrical No Pass: 05/17/22 17. Rough Mechanical Passed: 05/17/22 18. Rough Plumbing No Pass: 05/17/22 19. Fire Wall 20. Masonry/Stone Veneer 21. Stucco/Ext. Siding 22. Gas Line/Meter Set 23. Insulation 24. Sheetrock No Pass: 04/27/22 25. Shower Pan Partial Pass: 04/27/22 26. Fire Sprinkler 27. Power to Panel 28. Final Electrical 29. Final Mechanical 30. Final Plumbing 31. Final Fire Inspection 32. Pre-Final Site Visit 33. Final Inspection (Building)34. Final Inspection (Planning) 2022-05-24 14:57:25 Bendy Olsen Date Called In: 05-24-2022 Date Inspect On: 05-26-2022 AM PM Park City 445 Marsac Ave Park City, UT 84060 PHONE # (435) 615-5100 inspections@parkcity.org COMPLIANCE INSPECTION REPORT OWNER NAME: CLOTFELTER SHARON GEORGENE OWNER email: mpeay@wedgewood-inc.com OWNER/BUILDER: J&i remodeling corp Requested by: ADDRESS: 2651 LITTLE KATE RD, Park Meadows Sub. No. 1 , Lot # 11 , Park City Phone #: PERMIT #: 22-317 Email: Description: We want to pull permits for final inspection Permit Type: Remodel INSPECTION OF ITEMS LISTED BELOW: Building Inspections CONDITION OF INSPECTION: PASS 33 PARTIAL PASS NO PASS ITEMIZED AND DESCRIBED AS FOLLOWS: Final Inspection (Building) All previous items corrected. Could not verify temper on bathroom windows. Receipt provided showing tempered windows purchased. DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR 1. Radiant Tubing 2. Roof Framing 3. Roof Sheathing 4. Footings/Piers 5. Foundation 6. Grout/Bond Beam 7. Und. Plumbing 8. Und. Mechanical 9. Und. Electrical 10. Und. Gas Line 11. Slab/Holddowns 12. Slab on Grade 13. Shear Wall 14. Ext. Moisture Barrier Partial Pass: 04/27/22 15. Rough Framing No Pass: 05/24/22 16. Rough Electrical No Pass: 05/17/22 17. Rough Mechanical Passed: 05/17/22 18. Rough Plumbing No Pass: 05/17/22 19. Fire Wall 20. Masonry/Stone Veneer 21. Stucco/Ext. Siding 22. Gas Line/Meter Set 23. Insulation 24. Sheetrock No Pass: 04/27/22 25. Shower Pan Partial Pass: 04/27/22 26. Fire Sprinkler 27. Power to Panel 28. Final Electrical 29. Final Mechanical 30. Final Plumbing 31. Final Fire Inspection 32. Pre-Final Site Visit 33. Final Inspection (Building) Passed: 05/26/22 34. Final Inspection (Planning) 2022-05-26 13:04:03 Bendy Olsen Last Inspection Completed: Final Inspection (Building)By: Bendy Olsen Current Status: archived Date: 04/21/2022 Plan Review Documents Building Inspections 1. Wildland Urban Interface Inspection - 2. Radiant Tubing - 3. Roof Framing - 4. Roof Sheathing - 5. Footings/Piers - 6. Foundation - 7. Grout/Bond Beam - 8. Und. Plumbing - 9. Und. Mechanical - 10. Und. Electrical - 11. Und. Gas Line - 12. Slab/Holddowns - 13. Slab on Grade - 14. Shear Wall - 15. Ext. Moisture Barrier Partial Pass: 04/27/22 16. Rough Framing Failed: 05/24/22 17. Rough Electrical Failed: 05/17/22 18. Rough Mechanical Passed: 05/17/22 19. Rough Plumbing Failed: 05/17/22 20. Fire Wall - 21. Masonry/Stone Veneer - 22. Stucco/Ext. Siding - 23. Gas Line/Meter Set - 24. Insulation - 25. Sheetrock Failed: 04/27/22 26. Shower Pan Partial Pass: 04/27/22 27. Fire Sprinkler - 28. Power to Panel - 29. Final Electrical - 30. Final Mechanical - 31. Final Plumbing - 32. Final Fire Inspection - 33. Pre-Final Site Visit - 34. Final Inspection (Building) Passed: 05/26/22 35. Final Inspection (Planning) - Permit History Notes Attachments Front porch engineer Permit #: 22-317 (C) / Lot 11 / Park Meadows Sub. No. 1 / 2651 LITTLE KATE RD Created By: Jose coronado Submitted By: Jose coronado Accepted Date: 04/18/2022 Accepted By: Helen Davies Finalized Date: 04/21/2022 Finalized By: Clara Uchoa Issued By: Clara Uchoa Closed By: Crystal Kaufman 22-317 (C) Structural Engineering 04/21/22 Truss Calculations 04/21/22 Bid sheet to support valuation data 04/21/22 Construction Mitigation Plan (CMP) 04/21/22 04/07/22 - Crystal Kaufman - Flagged - No Inspections Allowed No Reminder - Structural Engineering for window above door and stairs that were re-built. . 04/27/22 - Clara Uchoa - Flagged - No Inspections Allowed No Reminder - Please provide licensed Electrical contractor for this project. Please feel free to contact the Building Dept. 435-615-5101 for any questions or concerns. Thank you.. 05/24/22 Bathroom window receipt Park City Building Department 445 Marsac Avenue, P.O. Box 1480, Park City, UT 84060 Tel 435.615.5101 https://www.parkcity.org/departments/building-department For questions about the construction mitigation plan requirements for your project: • If you have an issued permit, contact the Community Inspector assigned to your permit. • Otherwise contact the Building Department at 435-615-5101 or in person at the Building Department counter in City Hall. Visit the Building Department website for more information about hours and location https://www.parkcity.org/departments/building-department Construction Mitigation Plan 02.15.2022 **SUBJECT TO CHANGE** PERMIT: ________________ CONTRACTOR OR RESPONSIBLE PARTY: ______________________________ Please read this CMP carefully. Keep onsite with approved plans, for inspection. 1. Hours and days of operation. Municipal Code 11-14-6 Monday through Saturday, 7:00am to 9:00pm and Sunday, 9:00am to 6:00pm • Additional work hour limitations may be placed on Main St and Old Town construction sites. • Work hour extension request. Submit a written request to the Building Department. Allow (2) business days for processing. Include exact dates and times for the extension and a description of anticipated impacts (deliveries, outdoor lighting, noise, etc.). Requires approval from the Chief Building Official. If a legitimate complaint is received, the extension will be revoked. • Construction activities not permitted during restricted work dates: Loud work, deliveries, concrete pours, exports, street parking and work that disrupts traffic or impacts sidewalks. • Restricted work dates exception request. Work during the dates listed below, requires approval from the Chief Building Official. Apply for a restricted work date exception through the Building Department or online HERE or at www.parkcity.org Restricted work dates for 2022: New Years, Friday, December 31, 2021, after 3pm – Saturday, January 1, 2022. Martin Luther King, January 17, 2022. Sundance Film Festival, January 20- 30, 2022, Old Town constructions sites only (subject to change) Presidents Day, February 19 - 21, 2022. Park Silly Market, every Sunday, June– September 2022, Main St, Swede Alley & Heber Ave only (subject to change) Juneteenth, June 20, 2022. Independence Day, July 2 - 4, 2022 Kimball Arts Festival, TBD, Main St, Swede Alley & Heber Ave only (subject to change) Labor Day Weekend, September 5, 2022. Halloween, October 31, 2022, Main St, Swede Alley & Heber Ave only (subject to change). Thanksgiving, November 24 - 25, 2022. Christmas, December 25, 2022. New Years, December 31, 2022, after 3pm – January 1, 2023. Park City Building Department 445 Marsac Avenue, P.O. Box 1480, Park City, UT 84060 Tel 435.615.5101 https://www.parkcity.org/departments/building-department For questions about the construction mitigation plan requirements for your project: • If you have an issued permit, contact the Community Inspector assigned to your permit. • Otherwise contact the Building Department at 435-615-5101 or in person at the Building Department counter in City Hall. Visit the Building Department website for more information about hours and location https://www.parkcity.org/departments/building-department 2. Construction parking. Municipal Code 9-2-12, 11-14-4(B) • Park City Municipal Corporation has the authority to request a parking plan at any time. • On-street parking is limited to one side of the street, on pavement and shall maintain reasonable public and safety vehicle access. • Construction equipment (forklifts, cranes, backhoes, etc.) is not permitted to be driven or parked on public parking lots, city streets or private property unless otherwise approved. 3. Deliveries. Municipal Code 11-14-3, 11-14-4(C) • Deliveries are permitted during the allowed hours of operation. • Two flaggers will be present for all deliveries. • A partial road closure permit is required for deliveries longer than one-hour. • Delivery vehicle parking restrictions on Main St or Swede Alley: A. General Parking. -When south of Heber Ave, use the west side of Main St, 3:00am to 12:00 noon. -When north of Heber Ave, use Main St, 7:00am to 12:00 noon. -After 12:00 noon, parking on Main St is prohibited. -Any parking space is allowed on west side of Swede Alley, 3:00am to 4:00pm. B. Double parking. -When south of Heber Ave, use west side of Main St, 3:00am to 12:00 noon. -When north of Heber Ave, double parking is allowed on Main St, 7:00am to 12:00 noon. -Double parking allowed, provided delivery is expeditious, there is no curb parking available, and it does not inhibit traffic flow or block a legally parked car from leaving the curb. C. Use loading zones on west side of Swede Alley for deliveries to Main St after 12:00 noon. D. No parking on the east side of Swede Alley. E. No parking in such a manner to impede the flow of traffic. F. No parking while the engine idling. G. No parking on Park Ave, between Heber Ave and King Rd, while making deliveries to a business with a Main St address. H. City authorized special events and master festivals in the Main St Core may impact delivery vehicle operations; verify special requirements approved by City special events staff. 4. Stockpiling and staging. Municipal Code 11-14-3 • Required to be onsite and within the approved limits of disturbance (LOD) fence. • Separate right of way (ROW) permit is required if materials, dumpsters, or toilets are in ROW. • Additional site used for stockpiling or staging must be approved by the Building Department including an LOD fence and possibly a bond. Park City Building Department 445 Marsac Avenue, P.O. Box 1480, Park City, UT 84060 Tel 435.615.5101 https://www.parkcity.org/departments/building-department For questions about the construction mitigation plan requirements for your project: • If you have an issued permit, contact the Community Inspector assigned to your permit. • Otherwise contact the Building Department at 435-615-5101 or in person at the Building Department counter in City Hall. Visit the Building Department website for more information about hours and location https://www.parkcity.org/departments/building-department 5. Construction phasing. Municipal Code 11-14-4(D) • Requires approval from the Chief Building Official. • Must be maintained within the approved LOD area unless otherwise approved. 6. Trash management & recycling. Municipal Code 11-14-4(E), 11-14-5 • Construction site will provide adequate storage, a program for trash removal and will keep site clean daily. Recycling is encouraged. • Dumpsters must be placed within the approved LOD. Dumpsters or trash trailers parked on private property require written permission from the property owner. Dumpsters or trash trailers on the ROW require a permit from the Engineering Department. • Trash and construction related wastes will be deposited into a covered receptacle. 7. Control of dust & mud. Sediments and other materials will not be tracked from the site by vehicle traffic. Construction entrance roadways will be stabilized with gravel to inhibit sediments from being deposited into ROW’s. Accidental deposits will be swept up immediately and not washed down by rain or any other means. Municipal Code 11-14-4(F), 11-15-6 8. Noise will not exceed 65 decibels or violate the Park City noise ordinance. Municipal Code 11-14-4(G) 9. Grading and excavation. Municipal Code 11-14-4(H) • Grading and excavation are permitted during the allowed hours of operation. • Truck routes require approval by the Engineering Department and may be restricted to prevent adverse impacts. Cubic yards to be removed:_________________Destination:_______________________________. 10. Temporary lighting require approval by the Planning Department. See item 20, below. LMC 15-5-5(J) 11. Construction sign. Municipal Code 11-14-4(J) • Post onsite and in a location that is readable from the street. • Size limitations: maximum 12 square feet, and maximum 6 feet in height. • Lettering limitation: maximum 4 inches in height. • Include: Contractor name, address, phone number and emergency contact information. 12. Stormwater Pollution Prevention Plan (SWPPP). Municipal Code 13-4 • Install construction fence and Best Management Practices (BMPs) per approved plan. • Retain eroded sediments and other pollutants onsite from being transported from the site via street flow, swales, area drains, natural drainage course or wind. • Protect stockpile of earth and other construction-related materials from being transported from the site by wind. Park City Building Department 445 Marsac Avenue, P.O. Box 1480, Park City, UT 84060 Tel 435.615.5101 https://www.parkcity.org/departments/building-department For questions about the construction mitigation plan requirements for your project: • If you have an issued permit, contact the Community Inspector assigned to your permit. • Otherwise contact the Building Department at 435-615-5101 or in person at the Building Department counter in City Hall. Visit the Building Department website for more information about hours and location https://www.parkcity.org/departments/building-department • Fuels, oils, solvents, and other toxic materials will be stored per their listing and will not contaminate soil or surface waters. • All approved storage containers will be protected from weather. • Spills will be cleaned up immediately, disposed properly and not washed into drainage system. • Excess or waste concrete will not be washed into the public way or any drainage system. • Concrete equipment cleaned in properly constructed cleanout that will not leach into ground. 13. Toilet facilities. Municipal Code 11-14-5(B) • Construction sites will have permanent toilets with authorization, or temporary toilet facilities. • Toilets placed on right of way (ROW) require a ROW permit from the Engineering Department. 14. Soil Ordinance. Properties located within the soil ordinance boundary will comply Municipal Code 11-15, including but not limited to dust control, covering soil and approved soil disposal. 15. Partial road closures. • Required if one lane of travel is partially blocked by construction traffic or deliveries. • Allow (2) business days for permit processing. • Apply for permit online www.parkcity.org or through the Engineering Department. 16. Full road closures. • Allow (2) business days for permit processing. • Apply for permit online www.parkcity.org or through the Engineering Department. • Requires approval from the City Engineer. 17. Right of Way (ROW) permits. • Required for any work performed within the public right of way (ROW) • Allow (2) business days for permit processing. • Apply for permit online www.parkcity.org or through the Engineering Department. • Requires approval from the City Engineer. • Fencing of Public ROW requires the contractor to provide traffic circulation plan, traffic mitigation plan and pedestrian plan. See www.parkcity.org for Municipal Code 11-14-2. 18. Cranes. Municipal Code 11-14-3(B) • Requires approval from the Chief Building Official. • Contractor to submit site plan showing radius of boom over neighboring properties and streets. • Submit airspace and trespass agreements to the Building Department before crane installation. • Loaded or unloaded cranes will not swing over neighboring properties and streets, without prior approval. • Flaggers are required, when approval is granted, if crane will affect a right of way. Park City Building Department 445 Marsac Avenue, P.O. Box 1480, Park City, UT 84060 Tel 435.615.5101 https://www.parkcity.org/departments/building-department For questions about the construction mitigation plan requirements for your project: • If you have an issued permit, contact the Community Inspector assigned to your permit. • Otherwise contact the Building Department at 435-615-5101 or in person at the Building Department counter in City Hall. Visit the Building Department website for more information about hours and location https://www.parkcity.org/departments/building-department 19. Limits of disturbance (LOD) fence. Municipal Code 11-14-2, 11-14-3, 11-15-4, 13-4-5 • Chain link fencing may be required on sites with excavations deeper than 4ft. LMC 15-7.3-3(K) • Plastic fencing is acceptable on sites that are not being excavated. LMC 15-7.3-3(H.4) • All sites within the Historic District require chain link fencing that is 6ft high. LMC 15-7.3-3(K) • Install LOD fence per approved plans. Removal or alteration requires prior approval from the Building and Engineering Departments. Municipal Code 13-4-5(C) 20. Boardwalks. Municipal Code 11-14-2, LMC 15-5-5(J10) • May be required on some projects per the International Building Code. IBC 3306 • When required, they will have a mining theme and include lights and reflectors. • Sidewalks and streets beneath the boardwalk will be required or replaced, if necessary, before the certificate of occupancy is issued. • A monetary bond may be required by the Engineering Department for sidewalks and streets beneath the boardwalk. • Specifications are available at the Building Department. 21. Other issues. • Dogs are prohibited on construction sites. Municipal Code 7-3-5 • Contractor will inform neighboring property owners about the project and construction activities that may affect the area, such as, work that is loud or may disrupt traffic. • Mitigation will be in place to prevent impacts to the existing adjacent structures and existing infrastructure/streets from the construction. • Additional conditions in the MPD, CUP or other City approvals governing the lot also apply and are enforced in coordination with this construction mitigation plan and the building permit. 22. Utah State Code and Rules. Approved set of plans and mitigation include compliance with all Utah State Code and Rules, including Asbestos Rule R307-801 and Lead Paint Rules R307-840, 841, 842. Please Note: • It is the responsibility of the property owner and contractor to ensure compliance with all approved Master Plan Development and Conditional Use Permit subject to finding of facts and conclusion of Law and conditional of approval. • Park City Municipal Corporation (PCMC) a) Reserves the right to abate any inactive or abandoned construction site. b) Gives no guarantee of partial certificate of occupancies. c) May require the contractor to complete neighborhood noticing to their satisfaction. **If you need assistance, please call the Building Department 435-615-5101** Park City Building Department 445 Marsac Avenue, P.O. Box 1480, Park City, UT 84060 Tel 435.615.5101 https://www.parkcity.org/departments/building-department For questions about the construction mitigation plan requirements for your project: • If you have an issued permit, contact the Community Inspector assigned to your permit. • Otherwise contact the Building Department at 435-615-5101 or in person at the Building Department counter in City Hall. Visit the Building Department website for more information about hours and location https://www.parkcity.org/departments/building-department Site Specific Notes: www.crossroadsengineers.com garth@crossroadsengineers.com (801) 763-1932 Crossroads Engineers PC Structural Inspection Client Matt Peay Address 2651 Little Kate Road City & State Park City UT Client email mpeay@wedgewood-inc.com Disclaimer This report represents a good-faith effort to classify the non-cosmetic deficiencies in the structure, and represents a professional opinion relating to the structure. Although every effort is made to methodically assess the home’s condition, complete iden tification of all potential issues is not guaranteed. The inspector cannot see through walls and can only report on items that are inspectable. This report has been prepared for use by the client or clients listed above and may be relied upon only by that client. Use of this report by other unrelated parties is prohibited. Order Constructed Agent Client Present Type CX220414sa 1976 n/a Yes Structural www.crossroadsengineers.com garth@crossroadsengineers.com (801) 763-1932 Crossroads Engineers PC Invoice To: Matt Peay Send Payment to (if applicable) ENGINEER ORDER NO. ADDNL TESTS SHIPPED VIA COPIES TERMS Garth Haslem Cx220414sa None e-mail 1 Paid QUANTITY DESCRIPTION PRICE TOTAL 1 Structural inspection at 2651 Little Kate Road, Park City UT $800 $800.00 Total $800.00 Thank you for your business www.crossroadsengineers.com garth@crossroadsengineers.com (801) 763-1932 Summary and Conclusions On April 14, 2022 Garth Haslem of CEI performed a structural inspection on the property at 2651 Little Kate Road in Park City. This is a single family home, originally built in 1976. It is on a lot of 10,454 square feet and is also shown online as being a 4 bed, 2 bath, 1,879 square foot home. This home is being renovated. The builder intends to add a five foot window above the front door, add new steps at the front porch, and add a stairway from the back deck to the patio slab. As relates to the window, the engineer recommends a minimum two 2x8’s as a header above this window area. The remainder of the window can be framed in accordance with standard building practices. The front stairway is in place and is shown in the attached photography. This stairway meets structural requirements. The back stairway from the deck is also shown in the photography. This stairway also meets structural requirements. eSign: Garth Haslem President, Crossroads Engineering April 14, 2022 Utah PE 174649-2202 Window area above the front door. Opening is approxmiately five feet wide Front porch steps Another shot of the front porch steps Back deck Lower section of the back deck stairs. It’s about 9 ft horizontally and 7 ft vertically Top section of the back patio stairs Background Garth Haslem of CEI graduated from BYU in 1984 with a Civil Engineering Degree, and in 1985 with a master’s degree. He has been certified as a professional engineer and structural engineer since 1990. He began as a home inspector in 1993 and has performed thousands of inspections in that time. Garth has a variety of sites and publications that indicate his depth and experience in the field. These include approximately 30 published articles with a total of over 600,000 clicks, as well as over 150 podcasts. He has a Youtube channel with over 200 training videos and has published four books. He is certified by the State of Utah to provide real estate continuing education and has over 25 hours of certified courses. His findings as related to this home are provided in the Summary and Conclusions, lo cated on page 3 of this report.