Loading...
22-238 PreinspectionAPPROVALS DATE INFO 22-238 (C) CONTACT INFORMATION APPLICATION DETAILS APPLICATION NUMBER: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. I here-by certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be compiled with whether specified herein or not the granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction and that I make this statement under penalty of perjury. Park City Building Permit Permit #: Issue Date: 22-238 (C) 04/07/2022 Type of Improvement: Pre-inspection Description: Bldg. Address: 2651 LITTLE KATE RD City: Park City State: UT Zip: 84060 Subdivision: Phase: Block: Lot #: Parcel #: Property Owner: CLOTFELTER SHARON GEORGENE City: PARK CITY State: UT Zip: 84060 Permit Contact: Email: General Contractor: J&i remodeling corp License #: P: (385) 227-4585 City: State: Zip: Email: Coronadojose27@gmail.com Electrical Contractor: License #: P: City: State: Zip: Plumbing Contractor: License #: P: City: State: Zip: Email: Mechanical Contractor: License #: P: City: State: Zip: Email: $ Construction Valuation 0.00 $ Electrical Valuation 0.00 $ Plumbing Valuation 0.00 $ Mechanical Valuation 0.00 PERMIT FEES Inspection - Additional Services $ 0.00 Total Fees:$ 0.00 Setbacks Front:Rear:Left:Right: Min. Actual: Applicant Name: Signature of Builder/Authorized Agent or Owner:Date: Application Approved By:Date: Permit Issued By:Date: Dave Thacker 04/07/2022 Receipt #:Date: Date Called In: 04-07-2022 Date Inspect On: 04-11-2022 AM PM Park City 445 Marsac Ave Park City, UT 84060 PHONE # (435) 615-5100 inspections@parkcity.org COMPLIANCE INSPECTION REPORT OWNER NAME: CLOTFELTER SHARON GEORGENE OWNER email: OWNER/BUILDER: J&i remodeling corp Requested by: ADDRESS: 2651 LITTLE KATE RD , Park City Phone #: PERMIT #: 22-238 Email: Inspection Notes: This is for a true scope of work. INSPECTION OF ITEMS LISTED BELOW: Building Inspections CONDITION OF INSPECTION: PASS PARTIAL PASS NO PASS 2 ITEMIZED AND DESCRIBED AS FOLLOWS: Pre-Inspection Walk through to get scope of work. DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR 1. pre-inspection 2. Pre-Inspection No Pass: 04/11/22 3. Limits of Disturbance (LOD)4. Temp Power 5. Footings/Piers 6. Foundation 7. Grout/Bond Beam 8. Und. Plumbing 9. Und. Mechanical 10. Und. Electrical 11. Und. Gas Line 12. Slab/Holddowns 13. Slab on Grade 14. Shear Wall 15. Ext. Moisture Barrier 16. Roof Sheathing/Framing 17. Roof Covering 18. Rough Framing 19. Rough Electrical 20. Rough Mechanical 21. Rough Plumbing 22. Fire Wall 23. Masonry/Stone Veneer 24. Stucco/Ext. Siding 25. Gas Line/Meter Set 26. Insulation 27. Sheetrock 28. Shower Pan 29. Fire Sprinkler 30. Power to Panel 31. Retaining Wall 32. Fire Inspection 33. Final Electrical 34. Final Mechanical 35. Final Plumbing 36. Final Fire Inspection 37. Final 38. Drive Approach 39. Grading 40. Landscape 41. Solar Panel 42. Final Fire Inspection 43. Final Inspection (Building)44. Final Inspection (Planning) 45. Final Inspection (Engineering)46. Temp C/O 47. Final C/O 48. Stop Work Notice 2022-04-11 10:55:45 Bendy Olsen Date Called In: 04-07-2022 Date Inspect On: 04-11-2022 AM PM Park City 445 Marsac Ave Park City, UT 84060 PHONE # (435) 615-5100 brittney.buchanan@parkcity.org COMPLIANCE INSPECTION REPORT OWNER NAME: CLOTFELTER SHARON GEORGENE OWNER email: OWNER/BUILDER: J&i remodeling corp Requested by: ADDRESS: 2651 LITTLE KATE RD , Park City Phone #: PERMIT #: 22-238 Email: Inspection Notes: True scope of work INSPECTION OF ITEMS LISTED BELOW: Building Inspections CONDITION OF INSPECTION: PASS 2 PARTIAL PASS NO PASS ITEMIZED AND DESCRIBED AS FOLLOWS: Pre-Inspection I attended a site visit to determine full scope with Bendy Olsen and Ben Henrie. See Bendy's inspection - 04/11/2022 DATE & TIME SIGNATURE OF DESIGNATED COMPLIANCE INSPECTOR 1. pre-inspection 2. Pre-Inspection - re Passed: 04/11/22 3. Limits of Disturbance (LOD)4. Temp Power 5. Footings/Piers 6. Foundation 7. Grout/Bond Beam 8. Und. Plumbing 9. Und. Mechanical 10. Und. Electrical 11. Und. Gas Line 12. Slab/Holddowns 13. Slab on Grade 14. Shear Wall 15. Ext. Moisture Barrier 16. Roof Sheathing/Framing 17. Roof Covering 18. Rough Framing 19. Rough Electrical 20. Rough Mechanical 21. Rough Plumbing 22. Fire Wall 23. Masonry/Stone Veneer 24. Stucco/Ext. Siding 25. Gas Line/Meter Set 26. Insulation 27. Sheetrock 28. Shower Pan 29. Fire Sprinkler 30. Power to Panel 31. Retaining Wall 32. Fire Inspection 33. Final Electrical 34. Final Mechanical 35. Final Plumbing 36. Final Fire Inspection 37. Final 38. Drive Approach 39. Grading 40. Landscape 41. Solar Panel 42. Final Fire Inspection 43. Final Inspection (Building)44. Final Inspection (Planning) 45. Final Inspection (Engineering)46. Temp C/O 47. Final C/O 48. Stop Work Notice 2022-04-11 12:45:11 Brittney Buchanan Last Inspection Completed: Pre-Inspection By: Brittney Buchanan Current Status: archived Date: 04/07/2022 Building Inspections 1. pre-inspection - 2. Pre-Inspection Passed: 04/11/22 3. Limits of Disturbance (LOD) - 4. Temp Power - 5. Footings/Piers - 6. Foundation - 7. Grout/Bond Beam - 8. Und. Plumbing - 9. Und. Mechanical - 10. Und. Electrical - 11. Und. Gas Line - 12. Slab/Holddowns - 13. Slab on Grade - 14. Shear Wall - 15. Ext. Moisture Barrier - 16. Roof Sheathing/Framing - 17. Roof Covering - 18. Rough Framing - 19. Rough Electrical - 20. Rough Mechanical - 21. Rough Plumbing - 22. Fire Wall - 23. Masonry/Stone Veneer - 24. Stucco/Ext. Siding - 25. Gas Line/Meter Set - 26. Insulation - 27. Sheetrock - 28. Shower Pan - 29. Fire Sprinkler - 30. Power to Panel - 31. Retaining Wall - 32. Fire Inspection - 33. Final Electrical - 34. Final Mechanical - 35. Final Plumbing - 36. Final Fire Inspection - 37. Final - 38. Drive Approach - 39. Grading - 40. Landscape - 41. Solar Panel - 42. Final Fire Inspection - 43. Final Inspection (Building) - 44. Final Inspection (Planning) - 45. Final Inspection (Engineering) - 46. Temp C/O - 47. Final C/O - 48. Stop Work Notice - Permit History Notes Attachments J&i remodeling corp Permit #: 22-238 (C) / Lot / / 2651 LITTLE KATE RD Created By: Crystal Kaufman Issued By: Crystal Kaufman Closed By: Crystal Kaufman 22-238 (C) 04/07/22 Site Plan 04/07/22 Plans-interior